Gilmore Project
Berto Contractors is pleased to contribute to ONNI Group’s Gilmore Place Project, a master-planned community that will transform Burnaby’s western gateway into an incredible urban hub for residents and visitors alike.
Berto Contractors is pleased to contribute to ONNI Group’s Gilmore Place Project, a master-planned community that will transform Burnaby’s western gateway into an incredible urban hub for residents and visitors alike.
The Cordova Project entails the development of a constructable design aimed at relocating a 9-way Telus duct bank to accommodate a necessary deflection of a BC Hydro electrical vista.
The Victoria Drive Relocation Project included the installation of multiple 3152 manholes, 18-way duct bank as well as a 4,162 manhole in the middle of Victoria Drive and Broadway.
The Fraser Highway Locate included the installation of new poles South of the existing pole line to facilitate relocating existing aerial infrastructure.
This project included the relocation of 2ea 100mm conduits for the new HWY 1 widening effort.
The Pipeline Project involved consolidating designs from Rogers, Telus, and BC Hydro to ascertain which sections were to be accommodated within joint trench and which required an independent trench.