Our Work

Victoria Drive Relocation Project

Project Overview

The Victoria Drive Relocation Project included the installation of multiple 3152 manholes, 18-way duct bank as well as a 4,162 manhole in the middle of Victoria Drive and Broadway.

Challenge

Congested utility corridor, old growth trees with massive roots required hydrovac and tight time constraints to get manhole installed, which required closing major intersection rerouting buses and traffic. Excavation required onsite engineering due to depth which exceeded 5 metres.

Solution

Comprehensive preplanning along with site meetings with various stake holders.

End Result

Installation was completed on time with minimal disruption to public.

Berto offers comprehensive project management across every stage of development.

Our expertise covers design, construction, and ongoing maintenance, ensuring seamless delivery from start to finish. Our end-to-end capabilities can service a broad range of industries.