AXIOM Builders Project

Installed civil infrastructure for BC Hydro, including an 18-way duct bank. Overcame unstable soil and utility challenges with strategic stabilization, ensuring a durable, high-quality installation.

Burnaby Hospital

The Burnaby Hospital project involved the installation of CPPS & EPDS infrastructure to ensure reliable electrical and telecommunication continuity for Burnaby Hospital.

Gilmore Project

Berto Contractors is pleased to contribute to ONNI Group’s Gilmore Place Project, a master-planned community that will transform Burnaby’s western gateway into an incredible urban hub for residents and visitors alike.

Cordova Project

The Cordova Project entails the development of a constructable design aimed at relocating a 9-way Telus duct bank to accommodate a necessary deflection of a BC Hydro electrical vista.

Victoria Drive Relocation Project

The Victoria Drive Relocation Project included the installation of multiple 3152 manholes, 18-way duct bank as well as a 4,162 manhole in the middle of Victoria Drive and Broadway.

Fraser Highway Locate

The Fraser Highway Locate included the installation of new poles South of the existing pole line to facilitate relocating existing aerial infrastructure.

Pipeline Project

The Pipeline Project involved consolidating designs from Rogers, Telus, and BC Hydro to ascertain which sections were to be accommodated within joint trench and which required an independent trench.