The Pipeline Project involved consolidating designs from Rogers, Telus, and BC Hydro to ascertain which sections were to be accommodated within joint trench and which required an independent trench. Additionally, providing test hole locations to address third-party utility crossings over Metro Vancouver water mains. Furthermore, an additional design was required to delineate the 1.5m trench width concerning Metro Vancouver mains and the requisite support structures essential for protecting the water mains during construction.